Tehran Projects

  • Tehran- Karaj freeway, capacity improvement supervision

    Capacity increase for Tehran- Karaj freeway, from old toll gates to Klak Bridge, by widening in two lanes, pavement &shoulder modification.

    • Client:
      Tehran road &Urban Development Office
    • Study Project Manager:
      Mr.Ali Mirzaee
  • Hemat freeway extension, 2nd parcel supervision

    This 5.2 Km parcel is 35 M wide, it starts at the end of Tehran district 22 and temporarily connects to Tehran- Karaj freeway.

    • Client:
      Tehran road &Urban Development Office
    • Study Project Manager:
      Mr.Ali Mirzaee
  • Tehran- Karaj railway lane increase, above track &under track operation

    Tehran- Karaj railway lane increase is an EPC project (above track &under track operation). ImenRah is responsible for design and construction supervision. The 40 Km project intends to produce two lanes above –track &two lanes under-track construction up to Lashkari station, also two lanes under-track plus one lane above track from Lashkari station to Karaj are all part of the project’s scope of services.

    • Client:
      Islamic Republic of Iran Railways
    • Contract Value
      1.528.847.000Rial
    • Project start:
      1393/10/17
    • Contract Duration:
      540 Day
    • Physical Progress:
      13 %
    • Study Project Manager:
      Mr.Ali Mirzaee
    • Project manager:
      Mr.Ali Mirzaee
  • Safadasht City ring-road

    سSafadasht ring-0road was planned by Tehran road &Urban Development Office to reduce in-city accidents, increase service level and residents safety improvement. This ring-road can be used by pass through passenger traffic but can also be used by Safadasht industrial city heavy trucks traffic, project is currently in study stages.

    • Client:
      Tehran road &Urban Development Office
    • Project start:
      1393/11/12
    • Contract Duration:
      8 mo
    • Physical Progress:
      70% phase I
    • Study Project Manager:
      Dr.Vahid Khalifeh
    • Sub-projects:
      safadasht ring-road multi-level junction and Maskan Mehr multi-level junction.
  • 5 مشخصات پروژه

    توضیحات

    • Client:
      شرکت فرودگاههای کشور
    • Contract Value
      20.000.000.000Rial
    • Contract Duration:
      12 ماه
    • Study Project Manager:
      مهندس معصومه عطایی
    • Project manager:
      مهندس کورس عراقی
  • 6 مشخصات پروژه

    توضیحات

    • Client:
      شرکت فرودگاههای کشور
    • Contract Value
      20.000.000.000Rial
    • Contract Duration:
      12 ماه
    • Study Project Manager:
      مهندس معصومه عطایی
    • Project manager:
      مهندس کورس عراقی
  • 7 مشخصات پروژه

    توضیحات

    • Client:
      شرکت فرودگاههای کشور
    • Contract Value
      20.000.000.000Rial
    • Contract Duration:
      12 ماه
    • Study Project Manager:
      مهندس معصومه عطایی
    • Project manager:
      مهندس کورس عراقی
  • 8 مشخصات پروژه

    توضیحات

    • Client:
      شرکت فرودگاههای کشور
    • Contract Value
      20.000.000.000Rial
    • Contract Duration:
      12 ماه
    • Study Project Manager:
      مهندس معصومه عطایی
    • Project manager:
      مهندس کورس عراقی
  • 9 مشخصات پروژه

    توضیحات

    • Client:
      شرکت فرودگاههای کشور
    • Contract Value
      20.000.000.000Rial
    • Contract Duration:
      12 ماه
    • Study Project Manager:
      مهندس معصومه عطایی
    • Project manager:
      مهندس کورس عراقی
  • 10 مشخصات پروژه

    توضیحات

    • Client:
      شرکت فرودگاههای کشور
    • Contract Value
      20.000.000.000Rial
    • Contract Duration:
      12 ماه
    • Study Project Manager:
      مهندس معصومه عطایی
    • Project manager:
      مهندس کورس عراقی